East River Tunnel Rehabilitation Project
East River Tunnel Rehabilitation Project
The tunnel is part of Amtrak’s Northeast Corridor (NEC), which provides train service between Boston and Washington, DC, and is the busiest passenger rail line in the United States.
Quick Facts: East River Tunnel
Project Status
Construction
Customer Benefits
- Increased safety and service reliability through new fire detection systems
- Reconstructed bench walls
- New signal and power systems
- New track and drainage
- Modernized tunnel and rail systems infrastructure provides for reduced disruptions and maintenance costs
- Brings infrastructure to a state of good repair
Estimated Construction Completion
Estimated 2027
Latest Milestone
Construction contract award
Upcoming Milestones
Mobilization, early construction activities
Project Partners
Amtrak, Metropolitan Transportation Authority (MTA), New Jersey Transit, U.S. DOT Federal Railroad Administration (FRA)
Funding Sources
Amtrak, U.S. DOT FRA Federal-State Partnership for Intercity Passenger Rail Program, Metropolitan Transportation Authority and New Jersey Transit
The East River Tunnel (ERT) consists of four tubes connecting New York City to destinations east, and is used by Amtrak, Long Island Rail Road (LIRR), and NJ TRANSIT trains.
The tubes, which opened in 1910, require significant upgrades and comprehensive rehabilitation to modernize critical NEC infrastructure and improve reliability for a new era of rail.
The ERT Rehabilitation Project will restore the two tubes that were damaged by Superstorm Sandy. The work will modernize the tunnel infrastructure, improving safety, reliability, and security and bring the systems to a state of good repair. The project will involve demolishing the existing tunnel systems down to the concrete liners, followed by reconstructing and modernizing all tunnel systems. These include:
- Repair of the tunnel liner;
- Reconstruction of the bench walls in a modern, high-low configuration with new cable conduits;
- Conversion from ballasted track to a modern, direct fixation track system;
- Installation of new fire and smoke detection systems; and
- Replacement of signals, traction power, standpipe, and drainage systems.
In addition to the underground locations, work also will be performed at aboveground areas in Queens. This includes upgrading the tunnel approaches and installing new signal houses and signal and traction power cables. Additional work will be performed at two ventilation facilities in Manhattan and Queens.
The ERT Rehabilitation Project is partially funded by the Infrastructure Investment & Jobs Act (IIJA), also known as the Bipartisan Infrastructure Law (BIL). This includes funding received through the Federal Railroad Administration’s (FRA) Federal-State Partnership for State of Good Repair Program. The FRA has identified the ERT Rehabilitation Project as a “Major Backlog Project” on the NEC, which makes it eligible for additional federal funding to support final design and construction through the Federal-State Partnership for Intercity Passenger Rail Program.
Additional funding from the State of New York was announced in December 2021 by Senator Chuck Schumer, who facilitated an agreement in which MTA committed up to $432 million for the ERT Rehabilitation Project.
In June 2024, a construction contract was awarded to Skanska E-J ERT Joint Venture for the project.
Service Impacts
During construction, Amtrak plans to maintain the majority of train service through the remaining tunnels by closing one tube at a time. Additional projects completed ahead of the major tunnel work will help mitigate potential service impacts.
Amtrak and its railroad partners will provide advance notice to customers regarding any service changes as construction approaches.
Public Documents
Scope and Benefits
- Rehabilitation to bring the ERT to a state of good repair and extend its useful life for another 100 years
- Installation of new track, electrical, safety, and signals systems to add resiliency and improve reliability for NEC services
- Compliance with modern safety and egress standards
- Jobs and economic opportunities for local residents
- Continued service for 453 trains per day, including 42 Amtrak intercity trains and 411 LIRR commuter trains
Amtrak Guest Rewards
Forgot Password?
Passwords are case sensitive, should be at least 10 characters long and should include 1 uppercase and 1 lowercase alpha character, 1 number and 1 special character. ! " # $ % & ' ( ) * + , - . / : ; < = > ? @ [ \ ] ^ _ ` < | > ~
Enter the email address or member number associated with your account. We will send password reset instructions.
An email with password reset instructions is on the way.
That answer wasn’t correct either. We’ve sent you an email with instructions to reset your password instead.